Load bank Testing
Load bank testing helps ensure your generator will be fully dependable, operational, and capable of its highest possible load.
- 5kW-1,000kW
- drop off or on location
- examination and assessment of generator
- verify that all primary components are in proper working condition under loaded conditions
- tests your generator at its full kilowatt (kW) output rating
- maintaining adequate temperature and pressure levels
- part of your comprehensive generator maintenance plan
- ideally conducted each year